Utility-scale solar and agrivoltaic engineering
From land screening through to detailed design, we develop utility-scale solar and agrivoltaic plants and coordinate them with the agronomic and environmental assessments.
What the assignment covers
- Preliminary site screening: constraints, accessibility, land registry data and indicative installable capacity.
- Preliminary layout and optimisation of existing layouts.
- Detailed and construction design for plants already permitted.
- Integration of storage systems into new or existing plants.
- Coordination with the agronomic and environmental assessments for agrivoltaics.
Frequently asked questions
Can you assess a site before it is optioned or purchased?
Yes. We can carry out a preliminary screening to identify constraints, critical issues, accessibility, land compatibility, land registry characteristics, connection options and indicative installable capacity.
Can you develop the preliminary layout of a solar plant?
Yes. The layout can be developed taking into account land registry boundaries, constraints, setbacks, morphology, module technology, trackers or fixed structures, access roads, substations, cable ducts and connection works.
Can you optimise an existing layout?
Yes. We can review land use, string arrangement, excluded areas, interference, access roads, cable ducts and the ratio between installed capacity and available surface area.
Do you also work on agrivoltaics?
Yes. We can develop the engineering aspects of an agrivoltaic plant and coordinate them with the agronomic and environmental assessments the project requires.
Can you handle the detailed design of a plant that is already permitted?
Yes. We can review the permitted design, identify the conditions and requirements to be met, and develop the detailed or construction deliverables needed to take the project to site.
Can you integrate a BESS into an existing solar plant?
Yes. Before integration, the electrical configuration, available space, connection, metering systems, permitting compatibility and the impact on existing arrangements all need to be verified. For plants receiving incentives or operating under specific GSE schemes, dedicated notifications and technical documentation may also be required.
Do you have a project in development or a connection to verify?
Tell us where the permitting process stands and which voltage level you are connecting to.
Let's talk about your project