Track record

From 20 kV distribution to the 380 kV transmission grid.

The main projects we have delivered in energy engineering and grid infrastructure: substations, primary substations, overhead lines and connection works, together with the related generation and storage plants.

1.2 GW BESS capacity designed
380 kV Highest voltage level
7 In-house disciplines
All of Italy North, centre and islands

Full project list

Energy engineering and grid infrastructure
Project Scope Location Year Power
Final design and connection works — shared user substation 30/380 kV EHV · 380 kV Chiaramonte Gulfi (RG) 2025/2026 990 MW
Technical plan for Terna connection works — BESS plant EHV · 380 kV Chiaramonte Gulfi (RG) 2026 200 MW
Technical plan for Terna connection works — BESS plant EHV · 380 kV Chiaramonte Gulfi (RG) 2026 480 MW
Final design and connection works — shared user substation 30/150 kV HV · 150 kV Palazzo San Gervasio (PZ) 2025 250 MW
Final design — BESS plant, 215 MW BESS · AU Siculiana (AG) 2026 215 MW
Technical plan for Terna connection works — BESS plant HV · 220 kV Siculiana (AG) 2026 215 MW
Final design — BESS plant, 190 MW BESS · AU Brescia (BS) 2026 190 MW
Technical plan for Terna connection works — BESS plant HV · 132 kV Brescia (BS) 2026 190 MW
Final design — BESS plant, 141 MW BESS · AU Carlino (UD) 2025 141 MW
Technical plan for Terna connection works — 141 MW BESS plant EHV · 380 kV Carlino (UD) 2025 141 MW
Final design — BESS plant, 141 MW BESS · AU San Giorgio di Nogaro (UD) 2025 141 MW
Technical plan for Terna connection works — 141 MW BESS plant EHV · 380 kV San Giorgio di Nogaro (UD) 2025 141 MW
Final design — BESS plant, 120 MW BESS · AU Malo (VI) 2026 120 MW
Technical plan for Terna connection works — BESS plant HV · 132 kV Malo (VI) 2026 120 MW
Final design — BESS plant, 99 MW BESS · AU Fogliano Redipuglia (GO) 2025 99 MW
Technical plan for Terna connection works — 99 MW BESS plant HV · 132 kV Fogliano Redipuglia (GO) 2025 99 MW
Final design — BESS plant, 99 MW BESS · AU Calamonaci (AG) 2026 99 MW
Technical plan for Terna connection works — BESS plant HV · 36 kV Calamonaci (AG) 2026 99 MW
Agrivoltaic plant — as-built electrical design and final documentation AGRI · PV Ciminna (PA) 2026 67 MW
Final design — 150/20 kV primary substation HV/MV Palazzo San Gervasio (PZ) 2025 50 MW
Final design — 150 kV overhead line, 7 km HV · 150 kV Palazzo San Gervasio — Banzi (PZ) 2025
Final design — 150/36 kV RTN substation HV · 150/36 kV Marsala (TP) 2026
Final design — 150/36 kV RTN substation HV · 150/36 kV Mazara del Vallo (TP) 2026
Final design — 9.7 MWp agrivoltaic plant PV · PAS Gottolengo (BS) 2024 9.7 MW
Technical plan for E-Distribuzione connection works — 9.7 MW MV · 20 kV Gottolengo (BS) 2024 9.7 MW
Final design — BESS plant, 9,9 MW BESS · PAS Casale di Scodosia (PD) 2025/2026 9.9 MW
Technical plan for E-Distribuzione connection works — 9.9 MW MV · 20 kV Casale di Scodosia (PD) 2025/2026 9.9 MW
Technical plan for connection works — 9.9 MW wind farm MV · 20 kV Forenza — Palazzo San Gervasio (PZ) 2025 9.9 MW