Owner's engineering and construction support

We work alongside the client to control the EPC design and through construction, up to commissioning and entry into service of the plant.

What the assignment covers

  • Review of the EPC design against permits, contract and the connection solution.
  • Monitoring of the deliverables programme and the status of documents.
  • Technical assistance on site and review of variations.
  • Support to commissioning, punch lists and as-built documentation.
  • Acting as the local technical point of reference for international teams.

Frequently asked questions

Can you review the design developed by the EPC contractor?

Yes. We can verify the consistency of the EPC design with the permits, the contractual specifications, the connection solution, technical standards and the client's requirements.

Can you monitor the progress of the engineering?

Yes. We can track the deliverables programme, the status of documents, open comments, revisions, interfaces between disciplines and the closing out of documentary non-conformities.

Can you support the client during construction?

Yes. The scope can include technical assistance, review of variations, document monitoring, compliance checks and support at the interface between client, EPC contractor, suppliers and grid operator.

Can you assist us during commissioning and entry into service?

We can support the review of documentation, the checking of the required tests, the management of punch lists and verification that the final and as-built deliverables are complete.

Can you support an international team unfamiliar with Italian procedures?

Yes. We can act as the local technical point of reference, easing the interaction between the international client, the engineers, the authorities, the grid operator and the other parties involved in the project.

Do you have a project in development or a connection to verify?

Tell us where the permitting process stands and which voltage level you are connecting to.

Let's talk about your project